Every building, every asset, on one compliance map.
Facility inspection software for the recurring checks a multi-site portfolio carries: sprinklers, alarms, extinguishers, emergency lighting and generators. Hovermarks puts every building's checks on one platform, so a regional manager sees compliance for every site from one dashboard, refreshed on every load, and every check is tied to the device it was done on.
The challenges we hear most often
- Paper logs and spreadsheets that go missing during audits
- Reactive maintenance instead of planned compliance
- Subcontractors with no visibility into the asset register
- Statutory cycles running on different clocks per building, with nobody holding the master calendar
What a US building portfolio has to evidence
The cycles below come from the NFPA standards and the jurisdiction, not from Hovermarks. What changes with software is where the record lives and whether it is tied to the device that was checked.
Fire sprinkler systems
NFPA 25. Weekly or monthly gauges and valves, quarterly alarm devices, annual inspection, 5-year internal.
Record per system component with the date, the result and who did it.
Fire alarm systems
NFPA 72. Monthly to annual per Table 14.3.1, with waterflow and supervisory devices semi-annual in the 2025 edition.
Inspection and test record per device.
Portable extinguishers
NFPA 10. Monthly visual, annual maintenance, 6-year internal examination, hydrostatic test at 5 or 12 years.
Tag and record per unit, all four clocks visible.
Emergency and exit lighting
NFPA 101. 30-second functional test every 30 days, annual 90-minute test.
Result per luminaire with the test duration.
Emergency generators
NFPA 110. Weekly inspection, monthly test under load, annual load bank where monthly loading falls short, 4-hour test every 3 years for Level 1.
Log per test with load and duration.
Fire door assemblies
NFPA 80. Annual inspection and functional test.
Record per door with deficiencies and repairs.
Elevators
ASME A17.1 and the state or city code. Periodic inspection and test on the jurisdiction's cycle.
Certificate per car with the inspection date.
Building water systems
ASHRAE 188. Monitoring on the water management program's schedule.
Program log per control point.
Electrical equipment
NFPA 70B (2023). Condition-based maintenance intervals.
Maintenance record per item with its condition rating.
Backflow preventers
Local water authority. Annual test by a certified tester.
Test report filed with the authority.
What Hovermarks gives you
- Per-asset PPM schedules with auto-reminders
- Water hygiene logbook at outlet level: weekly flushing of infrequently used outlets and monthly sentinel temperatures with the run time recorded
- Contractor role for subcontractors, with access narrowed to inspections and assigned work orders: they work on their own company's paid licence, or on one of your seats
- Branded PDF reports with the inspector's sign-off signature
Use case
How a multi-site FM provider would use it
A regional FM team can print QR label sheets and branded cards for every site, import their asset list from a CSV and set the inspection schedule for each category, and go live the same week. Each engineer's checks sync to head office and appear on the central dashboard, audit packs are exportable on demand, and subcontractors are invited with the Contractor role. Invitations are free. A subcontractor whose own company is on a paid Hovermarks plan works on that licence; anyone else needs one of your seats to start work. Either way the role keeps their access narrow. When the fire authority or an insurer asks for the record on a specific door or outlet, the answer is a scan at the asset, not a search through three contractors' folders.
Frequently asked questions
- What does facility inspection software do?
- It gives every device in a building a QR-tagged record that opens the asset's default checklist with one tap after the scan, schedules the next check on the cycle the standard sets, and produces a branded PDF report tied to that device. Sprinkler, alarm, extinguisher, emergency lighting and generator checks sit on one calendar instead of in separate contractors' files.
- Do contractors need one of our seats?
- They need a licence, but not necessarily one of yours. A contractor whose own company is on a paid Hovermarks plan works for you on that licence and doesn't use one of your seats. Otherwise, including while their company is on its free trial, you assign them one of your seats; invitations are free and a seat is charged once assigned. Either way the Contractor role keeps their access narrow: they complete inspections and close assigned work orders, but cannot invite users, change settings, or see billing, reports or the audit log.
- How much does it cost?
- From $19 per user per month on Starter and $49 on Professional, with a 30-day free trial and no card required.
Stop chasing paperwork.
Start proving compliance.
Tag your first asset, run your first inspection, and export an auditor pack, all on your free 30-day trial. No credit card required.